Council have not followed there own Strategic Plan. 

(See extracts below and on following page.)

 

As far as we are aware no feasibility studies have been carried out in regard to relocating the overpass in Recommendation No. 3.

 

Infrastructure

 

Rec. No.

Action

Responsibility

Outcome Level

1.

Undertake negotiations with all lease holders within the Siege Site (Freight Victoria, Australian Rail Track, Rural City of Wangaratta), with project representation at state level (Tourism Victoria, State and Regional Development). (Refer also rec. no.21)

RCW

1

2.

Undertake further negotiations to determine the feasibility of a local and/or regional rail connection to provide a train service to Glenrowan.

RCW

1

3.

Determine the replacement timeframe for the existing overpass and undertake further feasibility studies for relocating the overpass.

RCW, VicR, DPT (and lease holders)

1

 

Recommendation number 26 has not been followed at all accept for some plant species.

 

7.1.2 ENVIRONMENTAL

Objective

To respond to the special character of Glenrowan’s physical environment, principally by reflecting the character of Kelly Country and north eastern Victoria, within the Town environs.

25.

Undertake an arboricultural assessment of the existing Siege site vegetation to confirm its remnant status. (refer also rec. no. 29 - Heritage).

RCW (potential funding through state and federal grants)

1

26.

Re-establish the original land forms and creek lines of the Siege Site and revegetate the site with indigenous vegetation. (refer also rec. no. 29 - Heritage)

RCW (potential funding through state and federal grants)

1

27.

Amend the Planning Scheme to include a Vegetation Protection Overlay to better protect the Siege site and Town environs. (Refer also rec. no.10)

RCW, DOI

1

28.

Undertake revegetation throughout the Town  using indigenous northern Victoria vegetation. (Refer also rec. no.12)

RCW, Community Groups

ongoing

 


Strategic Plan for Glenrowan.

 

No detailed plan has been designed for the sensitive and appropriate re-establishment of the 
Siege Site as suggested in Recommendations 29 and 30, and for the eventual removal of the overpass.

 

7.1.3 HERITAGE

Objective

To sensitively, and authentically conserve the Township heritage, and to develop and interpret the Siege Site, to reveal the many layers of the Kelly story. To connect the disparate elements of this story, within a wider Town and regional context.

Rec. No.

Recommendation

Responsibility

Outcome Level

29.

Undertake detailed design for the sensitive and appropriate re-establishment of the Siege Site, (incorporating linked sites within Glenrowan and ‘old Glenrowan’) according to the design initiatives, activity interpretation and Conservation Management Plan proposed by the Masterplan.

RCW (potential state and federal grants)

1

30.

Undertake staged implementation of the Siege Site re- establishment, including:

· archeological and arboricultural confirmation for re- establishing vegetation, topography, significant locations.

· undergrounding power lines

· removal of carparking

· removal of sundry elements

· removal of overpass and ramp (long term)

RCW (potential state and federal grants)

1

(yearly programs)

31.

Undertake staged implementation of the Siege Site Interpretive works, including:

· symbolic recreation of historic sites

· signage and sculptural elements

· activity trails

· removal of sundry elements

· removal of overpass and ramp (long term)

(Thanks to Gary Dean for providing the above information)